Case Studies

Image of installation at East Kent College, Broadstairs by Grummant

East Kent College - Broadstairs

May 2014

Grummant was awarded the above contract for the replacement of the main boilers at East Kent college Broadstairs, formally known as Thanet college.

The existing set up was very familiar to Grummant and even some long serving engineers as we were the installers of the boiler room refurbishment back in 1998/1999.

Works involved the removal of the 4no Hamworthy Wimbourne boilers and replaced with 5no Stokvis Econoflame with a combined output of 2.6 megawatts ( 2600 watts).

As the new boilers were being installed onto an old existing heating system feeding most of the building on site, We protected the boilers with individual Stokvis Heat Exchangers-GCD, complete with circulation pumps.

Contract Value £ >200,000.00

Image of installation at Kent at Canterbury - Oaks Nursery by Grummant

University of Kent at Canterbury - Oaks Nursery

Project :- Jenners Construction / Hamson JPA / Lee Evans Partnership

Oaks Nursery is a brand new building situated on the University of Kent, Canterbury Campus catering for all ages of preschool children. Its clever use of natural materials and organic colours both inside and out complement its beautiful surroundings.

Works included a central plant room, Honeywell Controls linked to existing on site network, zoned underfloor heating, natural ventilation, mechanical heat recovery ventilation and kitchen ventilation system.

Works were completed within the tight programme.

Image of installation at Wingham Wildlife Park - Biomass Phase 1 by Grummant

Wingham Wildlife Park - Biomass Phase 1 - Indoor Play Area

Grummant were delighted to secure the Clients first Biomass installation alongside the heating to the newly constructed indoor play area.

This isn't the Clients first Renewable energy source, but was the first Biomass installed on site and resulted in removal of Oil fired heating sources.

The Windhager Biomass boilers, 3000 litre buffer tank , pellet suction system and associated equipment was housed in a client purpose built standalone building, with easy access to for the pellet delivery vehicles.

Pre insulated pipework links the plant room and indoor play area, where RHI approved heat meters are installed with high level pipework extending to high level fan convector heaters.

All works were RHI approved, with Grummant starting and finishing the application.

We look forward to working with Wingham Wildlife on their next exciting venture, which we will update in due course.

The Meads Doctors Surgery, Sittingbourne

Project :- BEC / Walker Mower

The Meads Doctors Surgery is in the heart of The Meads community.

Grummant carried out the internal mechanical and plumbing installation, which involved the supply and installation of high efficiency boilers, zoned underfloor heating, energy management controls system extract ventilation and heat recovery ventilation, CAT 5 hot and cold water system for treatment areas, hot and cold services to all other areas, IT cooling system and above ground soil and waste.

Jan 2015

Contract Value £ >180,000.00

Image of installation at Kent MS Therapy Centre by Grummant

Kent MS Therapy Centre

Dec 2014

The centre, built by Epps Construction, has a main area and four wings, one each for physiotherapy, a gym, the hyperbaric oxygen chamber - where patients can breathe in pure oxygen in a pressure-filled chamber - and the hydrotherapy pool.

In the middle there is a social area with board rooms and a conference suite on the second floor.

The mechanical services were formed by external floor standing Air source heat pumps, solar hot water , zoned underfloor heating , hot and cold water services, control system and above ground soil and waste.

www.kentmstc.org.uk

Contract Value £>120,000.00

Image of installation at Herne Bay High School by Grummant

Herne Bay High School - Building Schools for the Future Project

Herne Bay High School was a three year contract as part of the Building Schools for the Future Project. The main contractor that Grummant worked with on this project was Provian. Grummant (Heating & Plumbing Services) Ltd supplied and installed all mechanical and plumbing services and systems as described below to form the new schools mechanical and plumbing services:

BSF - Value >£2,500,00.00

If you have any questions about our services at Grummant HPS, please don't hesitate to contact us on 01843 851272.

© 1984-2017 - Grummant Heating and Plumbing Services All Rights Reserved |

Home - Sitemap - Email us - Contact Us | Website by Broadbiz |